Feature · Paperwork

The observation schedule, written for you.

Certs drafted from your voice — coded, cited, ready to sign. Talk the board as you test it; every defect comes back worded properly, coded C1/C2/C3, with the regulation cited — laid out like the model forms you already sign.

Talk, don’t type

Said once on site. Back as a draft.

Send a voice note as you work — van noise, regional accents, “consumer unit” said six different ways and all. Modyx pulls out each observation, words it properly, codes it C1, C2 or C3, and cites the regulation behind it. Drafts follow BS 7671 and Best Practice Guide 4, so checking is fast.

It’s a draft, deliberately. The inspecting electrician makes every call and signs — “make obs 3 a C3” takes five seconds, exactly like correcting your own notes. We kill the typing, not the judgment.

Observation schedule 14 Elm Drive · EICR
14 Elm DriveEICR · in progress
22 Oak LaneEIC · board change
The HendersonsMinor Works
Observation schedule
C2Bedroom 2 — no RCD protection to socket circuit (Reg 411.3.3)
C1Consumer unit — exposed live terminal, no barrier
C3Bathroom — no supplementary bonding to pipework
C2Kitchen — no RCD on the ring final circuit
6 observations · coded & cited · you review and sign →

Bin the admin evening.

Start now →

First cert free · £1 a day · see the plan →